Excavated a 4,000 SF residence in GJ. Work included a 2ft over dig of the building footprint, water settling the in-situ alluvial clay subgrade, then backfilling the over dig in 6in moisture conditions lifts. #geotechnicalengineering #tatecivil #excavation #compaction
Tate Fairbanks
Comments