Tate Fairbanks
Mar 9, 2020
Geothermal Piping at Iron Mountain Hot Springs
We were able to lay 200ft of HDPE pipe across the parking lot at IMHS during a 2 day closure. We phased the work between the upper and...
Tate Fairbanks
Mar 9, 2020
Addition Foundation Excavation
Footing excavation, concrete slab prep, perimeter drain and sewer clean out complete. The addition is for a garage and shop space plus...
Tate Fairbanks
Mar 9, 2020
Water Line Service Install
Trenched and laid a water line. Shallow shale bedrock made for some tough digging. We used foam board in places to protect the...
Tate Fairbanks
Mar 9, 2020
Electric Service Install
We trenched and installed 500' of service line to a new transformer for a residence. The spare conduit (in orange) is for fiber optics....