Tate FairbanksMar 9, 2020Geothermal Piping at Iron Mountain Hot SpringsWe were able to lay 200ft of HDPE pipe across the parking lot at IMHS during a 2 day closure. We phased the work between the upper and...
Tate FairbanksMar 9, 2020Addition Foundation ExcavationFooting excavation, concrete slab prep, perimeter drain and sewer clean out complete. The addition is for a garage and shop space plus...
Tate FairbanksMar 9, 2020Water Line Service InstallTrenched and laid a water line. Shallow shale bedrock made for some tough digging. We used foam board in places to protect the...
Tate FairbanksMar 9, 2020Electric Service InstallWe trenched and installed 500' of service line to a new transformer for a residence. The spare conduit (in orange) is for fiber optics....